
Field Notes
Season 2026 · 12 field notes

Newest field note
Lab Update: Preparation Begins in Torres Vedras
At the Sociedade de História Natural, Marco Turcato starts preparing the blocks and builds a 3D model that can travel where the rock cannot.
Read field note →Earlier field notes
No. 1126 Oct 2026 · Algarve interior
Day 10: A Truck Full of Questions
On the final day of the season, the team plasters its last blocks, loads every jacket onto a truck bound for the…
Read field note →
No. 1026 Oct 2026 · Algarve interior
From Victor’s Sketchbook
Before the bones reach the lab, Victor Carvalho is already drawing the animals. A look inside his sketchbook, from a phytosaur skeleton…
Read field note →
No. 0925 Oct 2026 · Algarve interior
Day 9: The Blocks Take the Express Route
On the last day of digging, the team flips and plasters its biggest blocks, sends the rest down the hill on a…
Read field note →
No. 0824 Oct 2026 · Algarve interior
Day 8: The Hill Saves the Best for Last
On the hottest day of the season, the team jackets its last blocks, and both sites turn up bones it is not…
Read field note →
No. 0723 Oct 2026 · Algarve interior
Day 7: Thousands of Osteoderms, and Then a Tooth
The excavator returns to put the hill back, the blocks turn up a run of teeth, and a TV crew follows the…
Read field note →
No. 0622 Oct 2026 · Algarve interior
Day 6: The Excavator Says Goodbye
The excavator lifts the last blocks and leaves, the second site turns up fish and marine reptile bones, and 3 of the…
Read field note →
No. 0521 Oct 2026 · Algarve interior
Day 5: The Bones That Break Easiest
The second site’s layer gives up a complete fish and fragile long bones, the first site brings in a hammer to break…
Read field note →
No. 0420 Oct 2026 · Algarve interior
Day 4: The Hill Too High for the Excavator
On the first dry day, the second site opens its whole bone layer by hand, and the blocks at the first site…
Read field note →
No. 0319 Oct 2026 · Algarve interior
Day 3: The Layer Gives Up a Long Bone
The second site breaks into its fossil layer and finds a first long bone, while prospectors turn up 3 new sites in…
Read field note →
No. 0218 Oct 2026 · Algarve interior
Day 2: A Drill, Then Rain, With the Layer Almost Reached
On day 2 an excavator lifts blocks from the first site's fossil layer, while a drill takes the second team almost down…
Read field note →
No. 0117 Oct 2026 · Algarve interior
Opening Day: 2 Sites, 2 Promising Layers
The 2026 DinoDawn season opens in the Algarve with 2 teams, an excavator, a bucket line and what appear to be Late…
Read field note →